D2428
Seacure/Géocorail

Analysis of the stability of a scour protection solution, hydrodynamic measurement campaign (Pointe-à-Pitre)

Logo Seacure

As part of the preparation of a tender for the Grand Port Maritime of Guadeloupe (Leveling of the existing quay 12, STS Leveling and Scour Protection).
Pre-dimensioning of geocontainers (scour protection). Hydrodynamic stability analysis.

Execution study following award of the contract: in-situ measurements of currents induced by ship thrusters, hydrodynamic stability analyses, and geocontainer dimensioning .

16.229298615736, -61.544312238584